|
|
|
|
• Lead Paint: 16 CFR Part 1303
Children's products
• Lead in Children's Metal Jewelry:
CPSC Test Method
CPSC-CH-E1001-08
• Small Parts Rule (16 CFR Part 1501)
• Flammability of Hard and Soft Goods
• Flammability of Clothing Textile
(16 CFR Part 1610)
• PA Standard for Stuffing Cleanliness
• Soluble Toxic Metals
• Phthalates (CPSC-CH-C1001-09.2)
|
|
|
|
|
|
|
|
|
|
• Lead (Pb) Testing
• Phthalates
• Heavy Metals
• Soluble Metals
• PA Standard for
Stuffing Cleanliness
• Formaldehyde
• Volatile Organic
Compounds
|
• Asbestos
• Flammability
• Flash Point /
Combustion
testing
• Flame
Retardance
• Physical /
Mechanical
|
|
|
|
|
|
|
|
|
|
|
Contact Us to get started...
We’re ready when you are! A simple phone call to one of our Child Product Safety consultants at (401) 562-1323 is all that is needed to get your project started. You can also email us on our Contact page.
|
|
|
|
|
|
|
|
|
|
For over 30 years our biological & chemical laboratory has been testing for lead and other harmful substances in water, soil & air. The new CPSC regulations & EN-71 toy standards presented a natural fit for our expertise.
|
|
|
 |
|
|
The ToyTestingLab staff is fully trained in the use of methodologies and instrumentation necessary for Consumer Product Safety Commission Compliance Testing.
|
|
|
|
• NEW! Cryogenic Milling
• Microwave Digestion
• Soxhlet Extractors
• Multiple Tube Acid
Heating Block Digestors
• Flow Injection Mercury System
|
• Ion Chromotography
• Gas Chromatography (GC)
• Gas Chromatography-Mass
Spectrometry (GC-MS)
• Inductively Coupled Plasma (ICP)
• Inductively Coupled Plasma -
Mass Spectrometry (ICP-MS)
|
|
|
|
|
|
|
We are able to test a wide range of materials & components:
|
|
• Plastic
• Metal
• Paints & Coatings
• Adhesives
• Foam & Insulation
|
• Substrates
• Stuffing & Fillers
• Fabrics
• Small Parts
|
|
|
|
|
|
"The knowledgeable staff at the Toy Testing Lab have always provided me with prompt personalized service and maintains a very reasonable price structure. They have proven to be an extremely valuable resource and an important part of my compliancy arsenal given today's ever changing regulatory climate."
Sean Schipper, COO - Aeromax, Inc.
|
|
|
|
 |
|
|
There’s nothing worse than the uncertainty of waiting for test results, especially when they can severely affect your business. ToyTestingLab’s large facility has the capacity to handle projects of almost any size and our typical standard turnaround time is 10 business days.
|
|
|
|
 |
|
|
ToyTestingLab maintains a Comprehensive Quality Assurance (QA) Program. Oversight of all QA programs and policies are managed by a full time Quality Control Coordinator, who oversees the standard operating procedures used during samples preparation, analysis and final reporting of data.
|
|
|
|
|
|
|